San Vicente produces silver-zinc and silver-lead concentrates through standard floatation processes.

Mechanization efforts, enhanced mine dilution controls and improvements in site infrastructure are underway to lower production costs.

  • Ownership
    95%
  • Products
    Silver, Zinc, Copper, Lead
  • Type of Mine
    Underground

Producing Mine

14.6
Moz
Silver Reserves, Proven + Probable*

3.0
Moz
Silver Produced*

$
15.64
Cash Costs Per Ounce*

950
TPD
Average Plant Throughput

Technical & Reserve Information

Name and quantity Grade Contained Metal
Name Tonnes
(Mt)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
Ag
(Moz)
Cu
(kt)
Pb
(kt)
Zn
(kt)
P&P Reserves1.43100.310.283.4914.64451
M&I Resources1.12040.190.232.627.02328
Inferred Resources1.51880.220.272.639.23440

As of June 30, 2023. Please see the Company’s reserves and resources page for more detailed information.

* Data is on a consolidated basis for the period ended December 31, 2023. All financial data is stated in U.S. dollars unless otherwise noted. Estimated mineral reserves as of June 30, 2023. For complete mineral reserve and resource information, refer to Mineral Reserves and Resources. Cash Costs and AISC per ounce are a non-GAAP measures; please refer to the Non-GAAP Measures notice.